Tag: Fort Wayne City Utilities Deputy Director Matthew Wirtz
City: 91% participation achieved in lead line replacement effort
Fort Wayne Mayor Sharon Tucker celebrated a significant milestone toward enhancing neighborhood health and quality of life.
AFW photos and video: 3RPORT Protection and Overflow Reduction Tunnel ribbon cutting
Photos and video from the 3RPORT Protection and Overflow Reduction Tunnel ribbon cutting held today, November 14, 2024.
Deep Rock Tunnel ready to protect our rivers
Today, a crowd of neighborhood representatives, river enthusiasts, and City Utilities' staff members joined Mayor Sharon Tucker to cut the ribbon celebrating the culmination of the Deep Rock Tunnel's construction and its operational inauguration.
City Utilities’ new microgrid power generating network switched on
Today, Mayor Sharon Tucker helped flip the switch on City Utilities' innovative new Microgrid power generating network.
Record neighborhood infrastructure investments this year
Acting Mayor Karl Bandemer joined residents of the Rolling Hills neighborhood, City Council members and City Utilities staff to announce more than $130 million in water, sewer and stormwater improvements for this year that will strengthen neighborhoods.
Passive ponds float solar panels for power bonanza
In a pioneering move toward environmental sustainability and improved resiliency, Fort Wayne City Utilities celebrated progress on the installation of floating solar panels on the Water Pollution Control Plant’s wet weather storage ponds.
Natures protection caps off four year project
Mayor Tom Henry, neighborhood leaders, Indiana Department of Natural Resources representatives, City Council members, and City Utilities staff cut the ribbon for the Colonial Heritage Wetlands project.
Eight years of Blackhawk drainage improvements wrap-up
Mayor Tom Henry today joined residents of the Blackhawk neighborhood, Blackhawk Christian Schools and staff from City Utilities to celebrate significant drainage improvements.
Video: MamaJo celebration
The City of Fort Wayne announced on June 30, 2021, that the MamaJo Tunnel Boring Machine has almost completed the 3RPORT Three Rivers Protection and Overflow Reduction Tunnel.
MamaJo has reached Foster Park
Today, after pounding through nearly five miles of bedrock over three years, MamaJo, the Tunnel Boring Machine, called it a day.








