{"id":128979,"date":"2026-03-13T10:22:42","date_gmt":"2026-03-13T14:22:42","guid":{"rendered":"https:\/\/aroundfortwayne.com\/news\/?p=128979"},"modified":"2026-03-14T10:08:56","modified_gmt":"2026-03-14T14:08:56","slug":"repaving-and-bridge-construction-to-begin-on-coliseum-boulevard","status":"publish","type":"post","link":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/","title":{"rendered":"Repaving and bridge construction to begin on Coliseum Boulevard"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg\" alt=\"\" width=\"940\" height=\"788\" class=\"aligncenter size-full wp-image-128980\" srcset=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg 940w, https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT-300x251.jpg 300w, https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT-768x644.jpg 768w, https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT-501x420.jpg 501w, https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT-150x126.jpg 150w, https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT-696x583.jpg 696w\" sizes=\"auto, (max-width: 940px) 100vw, 940px\" \/><\/p>\n<p>The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.<\/p>\n<p><!--more--><\/p>\n<p>Indiana Department of Trnsportation news release:<\/p>\n<blockquote><p><strong>Repaving and bridge construction to begin on S.R. 930 in Fort Wayne<\/strong><\/p>\n<p>Allen County, Indiana (March 13, 2026) \u2013 The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.<\/p>\n<p>Starting on or after March 16, crews will be working on State Road 930\/Coliseum Boulevard between I-69 and East Washington Boulevard.<\/p>\n<p>Construction crews will begin with a bridge deck overlay on the S.R. 930 bridge over the Maumee River on or after March 16. During construction, drivers can expect intermittent lane closures in each direction of S.R. 930 in this area. Work on the bridge is expected to be complete by the end of November.<\/p>\n<p>Construction crews will complete structure replacements, curb work and resurfacing work in segments of S.R. 930 during the project. Most work will be completed during nighttime hours. Drivers can expect intermittent lane closures during the project, with stricter restrictions during the nighttime construction.<\/p>\n<p>Segments of work on S.R. 930 in 2026 include:<\/p>\n<p><strong>I-69 to U.S. 27\/Lima Road<\/strong><\/p>\n<ul>\n<li>Closure between Goshen Road and Investment Boulevard for one week starting on or after March 30<\/li>\n<li>Detour follows I-69 and U.S. 27\/Lima Road, or seek an alternate route<\/li>\n<\/ul>\n<p><strong>U.S. 27\/Lima Road to Clinton Street<\/strong><\/p>\n<p><strong>Clinton Street to Crescent Avenue<\/strong><\/p>\n<ul>\n<li>Harry Baals Drive \u2013 one-day closure in the beginning of April<\/li>\n<li>Anthony Boulevard &#8211; five-day road closure in mid-April<\/li>\n<\/ul>\n<p><strong>Crescent Avenue to E. State Boulevard<\/strong><\/p>\n<ul>\n<li>Work to be completed during the daytime hours for this segment<\/li>\n<li>Westbound S.R. 930 &#8211; weekend closure in mid-April<\/li>\n<li>Eastbound S.R. 930 &#8211; weekend closure at the end of April<\/li>\n<li>Vance Avenue \u2013 weekend closure at the beginning of May<\/li>\n<li>Westbound S.R. 930 \u2013 weekend closure at the beginning of May<\/li>\n<li>Eastbound S.R. 930 \u2013 weekend closure in mid-May<\/li>\n<\/ul>\n<p><strong>E. State Boulevard to Lake Avenue<\/strong><\/p>\n<ul>\n<li>Delaware Avenue \u2013 two-day closure in mid-May<\/li>\n<\/ul>\n<p><strong>Lake Avenue to E. Washington Boulevard<\/strong><\/p>\n<ul>\n<li>Structure work and curb construction<\/li>\n<li>Columbia Avenue \u2013 two-day closure in mid-May<\/li>\n<li>Westbound S.R. 930 \u2013 weekend closure at the end of May<\/li>\n<li>Eastbound S.R. 930 \u2013 weekend closure at the beginning of June<\/li>\n<\/ul>\n<p>Construction for this year is expected to be complete by the end of November. Dates of work and closures listed are approximate. All work is weather-dependent and schedules are subject to change.<\/p>\n<p>In 2027 crews will resurface the segment of S.R. 930 from Lake Avenue to E. Washington Boulevard as well as complete a bridge deck overlay on the S.R. 930 bridge over the Norfolk Southern Railroad just north of the S.R. 930 and E. Washington Boulevard interchange.<\/p>\n<p>INDOT encourages drivers to consider safety for all by slowing down, using extra caution and driving distraction-free when travelling in and around all work zones.<\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<h3>Related Images:<\/h3><div class=\"ngg-related-gallery\">\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/68972.jpg\"\n\t\t\ttitle=\"The northwest corner of the Charis House on Washington Boulevard.  This is the Charis House&#039;s current facility.  Photo taken February 8th 2009.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"55\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/68972.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_68972.jpg\" data-title=\"Northwest corner of the Charis House\" data-description=\"The northwest corner of the Charis House on Washington Boulevard.  This is the Charis House&#039;s current facility.  Photo taken February 8th 2009.\">\n\t\t\t<img title=\"Northwest corner of the Charis House\"\n\t\t\t\talt=\"Northwest corner of the Charis House\"\n\t\t\t\tdata-image-id=\"55\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_68972.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70530.jpg\"\n\t\t\ttitle=\"The current playground at the Charis House facility.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"125\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70530.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70530.jpg\" data-title=\"Playground\" data-description=\"The current playground at the Charis House facility.\">\n\t\t\t<img title=\"Playground\"\n\t\t\t\talt=\"Playground\"\n\t\t\t\tdata-image-id=\"125\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70530.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70533.jpg\"\n\t\t\ttitle=\"The current deck area at the Charis House facility.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"126\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70533.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70533.jpg\" data-title=\"Deck area\" data-description=\"The current deck area at the Charis House facility.\">\n\t\t\t<img title=\"Deck area\"\n\t\t\t\talt=\"Deck area\"\n\t\t\t\tdata-image-id=\"126\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70533.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70535.jpg\"\n\t\t\ttitle=\"The current deck area at the Charis House facility.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"127\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70535.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70535.jpg\" data-title=\"Deck area\" data-description=\"The current deck area at the Charis House facility.\">\n\t\t\t<img title=\"Deck area\"\n\t\t\t\talt=\"Deck area\"\n\t\t\t\tdata-image-id=\"127\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70535.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70537.jpg\"\n\t\t\ttitle=\"The current cooking facilities at the Charis House facility.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"128\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70537.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70537.jpg\" data-title=\"Cooking facilities\" data-description=\"The current cooking facilities at the Charis House facility.\">\n\t\t\t<img title=\"Cooking facilities\"\n\t\t\t\talt=\"Cooking facilities\"\n\t\t\t\tdata-image-id=\"128\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70537.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70538.jpg\"\n\t\t\ttitle=\"The current dining area at the Charis House facility.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"129\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70538.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70538.jpg\" data-title=\"Dining area\" data-description=\"The current dining area at the Charis House facility.\">\n\t\t\t<img title=\"Dining area\"\n\t\t\t\talt=\"Dining area\"\n\t\t\t\tdata-image-id=\"129\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70538.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70539.jpg\"\n\t\t\ttitle=\"One of the bedrooms at the current Charis House facility.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"130\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70539.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70539.jpg\" data-title=\"One of the bedrooms\" data-description=\"One of the bedrooms at the current Charis House facility.\">\n\t\t\t<img title=\"One of the bedrooms\"\n\t\t\t\talt=\"One of the bedrooms\"\n\t\t\t\tdata-image-id=\"130\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70539.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70540.jpg\"\n\t\t\ttitle=\"One of the bedrooms at the current Charis House facility.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"131\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70540.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70540.jpg\" data-title=\"One of the bedrooms\" data-description=\"One of the bedrooms at the current Charis House facility.\">\n\t\t\t<img title=\"One of the bedrooms\"\n\t\t\t\talt=\"One of the bedrooms\"\n\t\t\t\tdata-image-id=\"131\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70540.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70543.jpg\"\n\t\t\ttitle=\"The main entrance to the current Charis House.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"132\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70543.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70543.jpg\" data-title=\"Main entrance\" data-description=\"The main entrance to the current Charis House.\">\n\t\t\t<img title=\"Main entrance\"\n\t\t\t\talt=\"Main entrance\"\n\t\t\t\tdata-image-id=\"132\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70543.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70545.jpg\"\n\t\t\ttitle=\"The current Chapel and Learning Center at the Charis House.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"133\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/70545.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70545.jpg\" data-title=\"Chapel\/Learning Center\" data-description=\"The current Chapel and Learning Center at the Charis House.\">\n\t\t\t<img title=\"Chapel\/Learning Center\"\n\t\t\t\talt=\"Chapel\/Learning Center\"\n\t\t\t\tdata-image-id=\"133\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/charis-house\/thumbs\/thumbs_70545.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89167.jpg\"\n\t\t\ttitle=\"A Norfolk Southern Railway telemetry train traveled through downtown Fort Wayne on the former NKP line in downtown Fort Wayne on May 20, 2009.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"1856\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89167.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89167.jpg\" data-title=\"2009\/05\/20: A telemetry train passes through\" data-description=\"A Norfolk Southern Railway telemetry train traveled through downtown Fort Wayne on the former NKP line in downtown Fort Wayne on May 20, 2009.\">\n\t\t\t<img title=\"2009\/05\/20: A telemetry train passes through\"\n\t\t\t\talt=\"2009\/05\/20: A telemetry train passes through\"\n\t\t\t\tdata-image-id=\"1856\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89167.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89174.jpg\"\n\t\t\ttitle=\"A Norfolk Southern Railway telemetry train traveled through downtown Fort Wayne on the former NKP line in downtown Fort Wayne on May 20, 2009.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"1857\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89174.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89174.jpg\" data-title=\"2009\/05\/20: A telemetry train passes through\" data-description=\"A Norfolk Southern Railway telemetry train traveled through downtown Fort Wayne on the former NKP line in downtown Fort Wayne on May 20, 2009.\">\n\t\t\t<img title=\"2009\/05\/20: A telemetry train passes through\"\n\t\t\t\talt=\"2009\/05\/20: A telemetry train passes through\"\n\t\t\t\tdata-image-id=\"1857\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89174.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89209.jpg\"\n\t\t\ttitle=\"The Norfolk Southern Railway locomotive escorting the 765 pulls ahead to allow the 765 to turn on the wye on May 20, 2009.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"1861\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89209.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89209.jpg\" data-title=\"2009\/05\/20: NS engine escort\" data-description=\"The Norfolk Southern Railway locomotive escorting the 765 pulls ahead to allow the 765 to turn on the wye on May 20, 2009.\">\n\t\t\t<img title=\"2009\/05\/20: NS engine escort\"\n\t\t\t\talt=\"2009\/05\/20: NS engine escort\"\n\t\t\t\tdata-image-id=\"1861\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89209.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89369.jpg\"\n\t\t\ttitle=\"The 765 pulling over the Clinton Street overpass on May 20, 2009.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"1869\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/89369.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89369.jpg\" data-title=\"2009\/05\/20: Over Clinton Street\" data-description=\"The 765 pulling over the Clinton Street overpass on May 20, 2009.\">\n\t\t\t<img title=\"2009\/05\/20: Over Clinton Street\"\n\t\t\t\talt=\"2009\/05\/20: Over Clinton Street\"\n\t\t\t\tdata-image-id=\"1869\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/nkp-765\/thumbs\/thumbs_89369.jpg\"\/>\n\t\t<\/a>\n\t\t\t<a href=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/renaissance-square\/97736.jpg\"\n\t\t\ttitle=\"Southeast corner of Renaissance Square.  Photo taken June 28, 2009.\"\n\t\t\tclass='thickbox' rel='a38298e1d860a5fafa0d04203f87402b' data-image-id=\"2587\" data-src=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/renaissance-square\/97736.jpg\" data-thumbnail=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/renaissance-square\/thumbs\/thumbs_97736.jpg\" data-title=\"Southeast corner\" data-description=\"Southeast corner of Renaissance Square.  Photo taken June 28, 2009.\">\n\t\t\t<img title=\"Southeast corner\"\n\t\t\t\talt=\"Southeast corner\"\n\t\t\t\tdata-image-id=\"2587\"\n\t\t\t\tsrc=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/gallery\/renaissance-square\/thumbs\/thumbs_97736.jpg\"\/>\n\t\t<\/a>\n\t<\/div>","protected":false},"excerpt":{"rendered":"<p>The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.<\/p>\n","protected":false},"author":1,"featured_media":128980,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[2195],"tags":[8975,4897,34933,119,4206,12971,5521,15841,23,5588,11998,6898,1415,41013,5739,2362,1142,211,7020,2482,4374,41014,136],"class_list":["post-128979","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-indiana-department-of-transportation","tag-allen-county-indiana","tag-anthony-boulevard","tag-asphalt-resurfacing","tag-clinton-street","tag-coliseum-boulevard","tag-columbia-avenue","tag-crescent-avenue","tag-delaware-avenue","tag-fort-wayne-indiana","tag-goshen-road","tag-harry-baals-drive","tag-i-69","tag-indot-indiana-department-of-transportation","tag-investment-boulevard","tag-lake-avenue","tag-lima-road","tag-maumee-river","tag-norfolk-southern-railway","tag-sr-930","tag-state-boulevard","tag-us-27","tag-vamce-avenue","tag-washington-boulevard"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Repaving and bridge construction to begin on Coliseum Boulevard - AroundFortWayne<\/title>\n<meta name=\"description\" content=\"The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Repaving and bridge construction to begin on Coliseum Boulevard - AroundFortWayne\" \/>\n<meta property=\"og:description\" content=\"The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/\" \/>\n<meta property=\"og:site_name\" content=\"AroundFortWayne\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AroundFortWayne\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-13T14:22:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-14T14:08:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"940\" \/>\n\t<meta property=\"og:image:height\" content=\"788\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"67slparker\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@TheAFWBlog\" \/>\n<meta name=\"twitter:site\" content=\"@TheAFWBlog\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"67slparker\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/\"},\"author\":{\"name\":\"67slparker\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#\/schema\/person\/60a1c82ca1de84bb660471939e6393b2\"},\"headline\":\"Repaving and bridge construction to begin on Coliseum Boulevard\",\"datePublished\":\"2026-03-13T14:22:42+00:00\",\"dateModified\":\"2026-03-14T14:08:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/\"},\"wordCount\":465,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#organization\"},\"image\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg\",\"keywords\":[\"Allen County Indiana\",\"Anthony Boulevard\",\"asphalt resurfacing\",\"Clinton Street\",\"Coliseum Boulevard\",\"Columbia Avenue\",\"Crescent Avenue\",\"Delaware Avenue\",\"Fort Wayne Indiana\",\"Goshen Road\",\"Harry Baals Drive\",\"I-69\",\"INDOT Indiana Department of Transportation\",\"Investment Boulevard\",\"Lake Avenue\",\"Lima Road\",\"Maumee River\",\"Norfolk Southern Railway\",\"SR 930\",\"State Boulevard\",\"US 27\",\"Vamce Avenue\",\"Washington Boulevard\"],\"articleSection\":[\"Indiana Department of Transportation\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/\",\"url\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/\",\"name\":\"Repaving and bridge construction to begin on Coliseum Boulevard - AroundFortWayne\",\"isPartOf\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg\",\"datePublished\":\"2026-03-13T14:22:42+00:00\",\"dateModified\":\"2026-03-14T14:08:56+00:00\",\"description\":\"The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.\",\"breadcrumb\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage\",\"url\":\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg\",\"contentUrl\":\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg\",\"width\":940,\"height\":788},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/aroundfortwayne.com\/news\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Repaving and bridge construction to begin on Coliseum Boulevard\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#website\",\"url\":\"https:\/\/aroundfortwayne.com\/news\/\",\"name\":\"AroundFortWayne\",\"description\":\"News AroundFortWayne Indiana.\",\"publisher\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/aroundfortwayne.com\/news\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#organization\",\"name\":\"AroundFortWayne\",\"url\":\"https:\/\/aroundfortwayne.com\/news\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2020\/11\/AFW_logo_400.jpg\",\"contentUrl\":\"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2020\/11\/AFW_logo_400.jpg\",\"width\":400,\"height\":400,\"caption\":\"AroundFortWayne\"},\"image\":{\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/AroundFortWayne\",\"https:\/\/x.com\/TheAFWBlog\",\"https:\/\/www.instagram.com\/aroundfortwayne\/\",\"https:\/\/www.pinterest.com\/aroundfortwayne\/\",\"https:\/\/www.youtube.com\/channel\/UCCL2Biqou6j8uZ-TSxPa6aQ\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#\/schema\/person\/60a1c82ca1de84bb660471939e6393b2\",\"name\":\"67slparker\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aroundfortwayne.com\/news\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0249a34fbb7d86a3c14c6ed43adaf57e3dd6443bb0428d4ed5fc62860779bc3b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0249a34fbb7d86a3c14c6ed43adaf57e3dd6443bb0428d4ed5fc62860779bc3b?s=96&d=mm&r=g\",\"caption\":\"67slparker\"},\"sameAs\":[\"https:\/\/aroundfortwayne.com\/wptest\"],\"url\":\"https:\/\/aroundfortwayne.com\/news\/author\/67slparker\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Repaving and bridge construction to begin on Coliseum Boulevard - AroundFortWayne","description":"The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/","og_locale":"en_US","og_type":"article","og_title":"Repaving and bridge construction to begin on Coliseum Boulevard - AroundFortWayne","og_description":"The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.","og_url":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/","og_site_name":"AroundFortWayne","article_publisher":"https:\/\/www.facebook.com\/AroundFortWayne","article_published_time":"2026-03-13T14:22:42+00:00","article_modified_time":"2026-03-14T14:08:56+00:00","og_image":[{"width":940,"height":788,"url":"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg","type":"image\/jpeg"}],"author":"67slparker","twitter_card":"summary_large_image","twitter_creator":"@TheAFWBlog","twitter_site":"@TheAFWBlog","twitter_misc":{"Written by":"67slparker","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#article","isPartOf":{"@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/"},"author":{"name":"67slparker","@id":"https:\/\/aroundfortwayne.com\/news\/#\/schema\/person\/60a1c82ca1de84bb660471939e6393b2"},"headline":"Repaving and bridge construction to begin on Coliseum Boulevard","datePublished":"2026-03-13T14:22:42+00:00","dateModified":"2026-03-14T14:08:56+00:00","mainEntityOfPage":{"@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/"},"wordCount":465,"commentCount":0,"publisher":{"@id":"https:\/\/aroundfortwayne.com\/news\/#organization"},"image":{"@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage"},"thumbnailUrl":"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg","keywords":["Allen County Indiana","Anthony Boulevard","asphalt resurfacing","Clinton Street","Coliseum Boulevard","Columbia Avenue","Crescent Avenue","Delaware Avenue","Fort Wayne Indiana","Goshen Road","Harry Baals Drive","I-69","INDOT Indiana Department of Transportation","Investment Boulevard","Lake Avenue","Lima Road","Maumee River","Norfolk Southern Railway","SR 930","State Boulevard","US 27","Vamce Avenue","Washington Boulevard"],"articleSection":["Indiana Department of Transportation"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/","url":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/","name":"Repaving and bridge construction to begin on Coliseum Boulevard - AroundFortWayne","isPartOf":{"@id":"https:\/\/aroundfortwayne.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage"},"image":{"@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage"},"thumbnailUrl":"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg","datePublished":"2026-03-13T14:22:42+00:00","dateModified":"2026-03-14T14:08:56+00:00","description":"The Indiana Department of Transportation announces a road resurfacing and bridge construction project in Fort Wayne.","breadcrumb":{"@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#primaryimage","url":"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg","contentUrl":"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2026\/03\/20260313-INDOT.jpg","width":940,"height":788},{"@type":"BreadcrumbList","@id":"https:\/\/aroundfortwayne.com\/news\/2026\/03\/13\/repaving-and-bridge-construction-to-begin-on-coliseum-boulevard\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/aroundfortwayne.com\/news\/"},{"@type":"ListItem","position":2,"name":"Repaving and bridge construction to begin on Coliseum Boulevard"}]},{"@type":"WebSite","@id":"https:\/\/aroundfortwayne.com\/news\/#website","url":"https:\/\/aroundfortwayne.com\/news\/","name":"AroundFortWayne","description":"News AroundFortWayne Indiana.","publisher":{"@id":"https:\/\/aroundfortwayne.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aroundfortwayne.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aroundfortwayne.com\/news\/#organization","name":"AroundFortWayne","url":"https:\/\/aroundfortwayne.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aroundfortwayne.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2020\/11\/AFW_logo_400.jpg","contentUrl":"https:\/\/aroundfortwayne.com\/news\/wp-content\/uploads\/2020\/11\/AFW_logo_400.jpg","width":400,"height":400,"caption":"AroundFortWayne"},"image":{"@id":"https:\/\/aroundfortwayne.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AroundFortWayne","https:\/\/x.com\/TheAFWBlog","https:\/\/www.instagram.com\/aroundfortwayne\/","https:\/\/www.pinterest.com\/aroundfortwayne\/","https:\/\/www.youtube.com\/channel\/UCCL2Biqou6j8uZ-TSxPa6aQ"]},{"@type":"Person","@id":"https:\/\/aroundfortwayne.com\/news\/#\/schema\/person\/60a1c82ca1de84bb660471939e6393b2","name":"67slparker","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aroundfortwayne.com\/news\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0249a34fbb7d86a3c14c6ed43adaf57e3dd6443bb0428d4ed5fc62860779bc3b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0249a34fbb7d86a3c14c6ed43adaf57e3dd6443bb0428d4ed5fc62860779bc3b?s=96&d=mm&r=g","caption":"67slparker"},"sameAs":["https:\/\/aroundfortwayne.com\/wptest"],"url":"https:\/\/aroundfortwayne.com\/news\/author\/67slparker\/"}]}},"_links":{"self":[{"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/posts\/128979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/comments?post=128979"}],"version-history":[{"count":1,"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/posts\/128979\/revisions"}],"predecessor-version":[{"id":128981,"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/posts\/128979\/revisions\/128981"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/media\/128980"}],"wp:attachment":[{"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/media?parent=128979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/categories?post=128979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aroundfortwayne.com\/news\/wp-json\/wp\/v2\/tags?post=128979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}