News release from INDOT:
S.R. 930 Bridge Work Scheduled to Begin Wednesday, March 25
Traffic restricted to one lane in each direction over East Washington Boulevard
(March 23, 2015) – The Indiana Department of Transportation announces that bridge rehabilitation work is scheduled to begin on S.R. 930/Coliseum Boulevard over E. Washington Boulevard on Wednesday, March 25, weather permitting.
At 9 a.m. on Wednesday, March 25, the left lane of S.R. 930/Coliseum Blvd. in both directions is scheduled to be restricted over East Washington Boulevard. Motorists can expect to see heavy equipment in the area preparing for the bridge deck rehabilitation.
All ramps will remain open. An advisory speed limit of 35 mph will be posted throughout the work zone. INDOT reminds drivers to use caution and consider worker safety when driving through an active construction zone.
These lane restrictions will remain in effect until August of 2015.
The project was awarded to R.L. McCoy for $867,000.