AroundFortWayne

Till Road to close temporarily starting Friday

City of Fort Wayne Seal

Press release from the City of Fort Wayne:

Till Road to close temporarily starting Friday
Work part of INDOT’s SR 3/Lima Road lane widening project

The Indiana Department of Transportation Fort Wayne District will close Till Road between Coldwater and Lima roads starting at 6 a.m. Friday, weather permitting, for approximately two weeks to construct the new pavement approach to Lima Road.

Drivers should use Cook and Coldwater roads as alternate routes during the closure. Local traffic can access Till Road via Coldwater.

This closure is part of an INDOT added travel lanes project on Lima Road/S.R. 3, which extends from Ludwig Road to Dupont Road.

The 2.88-mile added travel lanes project includes three northbound and three southbound lanes, raised center curb median separating opposing traffic, curb/gutter, closed drainage system, inlets, sewer pipes, and an 8-foot-wide multiuse path on both sides. Project will be complete in 2011.

All closures are weather permitting.

Exit mobile version